Fiji Bridge Rebuild

WILDBOAR CONCRETE FREE FOOTINGS

Fiji Bridge Rebuild

Wildboar Footings supplied footings for a bridge repiling project in Fiji. Custom stainless steel feet manufactured to take locally supplied timber 320 SED posts. The bridge was in a coastal area exposed to cyclones and a highly corrosive saltwater environment. Stainless steel piles were driven through coral and sand down to 3.2 meters.
Fiji Bridge Rebuild
Need Help?