Built Strong. With capacities up to 50 tons per foot.
Wildboar can offer significant time and cost saving
on your next commercial building project.
• Concrete Tilt Slab
• CLT or SIPs
• Portal Frame
• Under pinning
SUPERIOR
HOLD
Installation with hand tools without the need for specialist skilled operators. No heavy machinery.
FASTEST
INSTALL
Installs can be take place during regular building works, without heavy machinery and are instant load bearing so ready to use immediately.
COST-
EFFECTIVE
No mess, no fuss, any weather, no specialist trades, instant load bearing, no wait time, soft sand to hard rock – all equate to less time and cost.
GUARANTEE
Designed and made in NZ. Backed by our replacement guaranty of quality.




