Surefoot

THE SUREFOOT PRINCIPLE

Surefoot’s engineering principles are based on a combination of shallow and deep foundation design methodology. It uses the theory of bearing capacity of a shallow foundation, plus the skin friction and toe resistance of a deep foundation in all soil types through a fully certified footing design. Micro Piles are driven with a jackhammer. The footing has instant capacity and does not disturb the ground, therefore affording tremendous efficiency of time, labour, material and project cost.

Low cost time saving, high strength & instant bearing capacity the Surefoot pile cap mimics a tree’s root system through a series of steel micro piles in a battered array, resolving foundations at relatively shallow depths and efficient transfer of load and uplift forces with minimal soil disturbance.

SUREFOOT FOOTINGS ARE

  • High Strength
  • Simple
  • Cost Effective
  • Quick to install
  • Minimal soil and site disturbance
  • Recyclable and reusable
  • Suitable for large floor spans up to 4m
  • Suitable for cyclonic regions
  • Ideal for remote areas and difficult terrain
  • Backed by our technical support team
  • Idependantly tested to ASTM piling standards
  • Green Solution with low carbon foot print
  • Ability to support various tyopes of loading such as compression, uplift, lateral loads, and bending moments
  • Suitable in any soil such as sand, silt, clay, gravels and even rock.
S150

S150

  • Bolting Pattern:
    90mm centres x 4 x 16mm holes
  • Micro Piles:
    4 x 25NB (Nominal Bore) 33.7OD
    Galvanised Pipe Light, Medium,Heavy
  • Load Capacity:
    Up to 90kN
  • Average installation time:
    10 minutes approx
      

S250

  • Bolting Pattern:
    140mm centres x 4 x 22mm holes
  • Micro Piles:
    4 x 32NB (Nominal Bore) 42.40D
    Galvanised Pipe Light, Medium,Heavy
  • Load Capacity:
    Up to 100kN
  • Average installation time:
    10 minutes approx
S250
S400

S400 – 12 pile

  • Bolting Pattern:
    198-250 PCD x 4 x 22mm holes
    300-350 PCD x 4 x 26mm holes
  • Micro Piles:
    12 x 32NB (Nominal Bore) 42.4OD
    Galvanized Pipe Light, Medium, Heavy, Stainless Steel
  • Load Capacity:
    Up to 300kN
  • Average installation time:
    20 minutes approx.

S600

  • Bolting Pattern:
    350-400 PCD x 4 x 26mm holes
    432-500 PCD x 4 x 32mm holes
  • Micro Piles:
    16 x 32NB (Nominal Bore) 42.4OD
    Galvanised Pile Light, Medium, Heavy
  • Load Capacity:
    Up to 360kN
  • Average installation time:
    40 minutes approx.
S600
Sureframe

Sureframe

Concrete Free cabinet bases. Suitable for Telco and outdoor power applications