Surefoot S400 12 pile Concrete Free Footings

 

 

Category: Tag:

S400 – 12 pile

  • Bolting Pattern:
    198-250 PCD x 4 x 22mm holes
    300-350 PCD x 4 x 26mm holes
  • Micro Piles:
    12 x 32NB (Nominal Bore) 42.4OD
    Galvanized Pipe Light, Medium, Heavy, Stainless Steel
  • Load Capacity:
    Up to 300kN
  • Average installation time:
    20 minutes approx.

Reviews

There are no reviews yet.

Be the first to review “Surefoot S400 12 pile Concrete Free Footings”

Your email address will not be published.